Past Performances

01
Project Name:2018 Ramp Replacement Program
Description:

Demolition, replacement and construction of 63 sidewalk ramps to meet ADA standards.

Contract Number:TB801
Owner/Agency:City of Marysville
Location:Marysville, WA
Completion Date:July 2018
02
Project Name:Cooler Door – South Whidbey Community Center
Description:

Installation of new external door in the Cooler gym of South Whidbey School District/South Whidbey Community Center.

Contract Number:PO 2201700049
Owner/Agency:South Whidbey School District
Location:Langley, WA
Completion Date:June 2018
03
Project Name:FDA Phase II Interior Refresh
Description:

Provide construction services associated with the Phase II Interior Refresh Project within the FDA building. Clean, repair and paint the interior of the PRLNW building. The construction includes all work of office pods area, new hallway flooring, Halon System removal, refresh of other areas (not pods), window shades in office pods and refresh and infrastructure for office pods.

Contract Number:GS-10-P-16-LT-D-7001/GS-P-10-17-LT-0054
Owner/Agency:General Services Administration
Location:Bothell, WA
Completion Date:May 2018
04
Project Name:Renovation of Multiple Buildings for Relocating Occupants of B243
Description:

This is a design-bid-build construction contract to renovate multiple office spaces in buildings 100, 103, and 2739 to relocate occupants of B243 that will be demolished under P-240.

Contract Number:N4425517C2001
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:May 2018
05
Project Name:Hoh Rain Forest Wastewater Treatment and Disposal System
Description:

Modifications to the Hoh Rain Forest Wastewater Treatment and Disposal System to meet Washington State Department of Health large on-site sewage system permit requirements. The work includes removal of vegetation to expand the drain field footprint and excavation of the expanded drain field as needed to install new treatment-disposal system; construction of new sand-lined beds and installation of pressurized subsurface drip emitter system; back-fill and surface restoration; and removal of existing septic tank aeration equipment and installation of new aeration pump/blowers.

Contract Number:P17PC00416
Owner/Agency:National Park Service
Location:Hoh Rain Forest, Olympic National Park
Completion Date:May 2018
06
Project Name:Replace MV Feeder from PMS26 to TX0271
Description:

The project is a construction action to replace XLP 15KV medium voltage cables originally installed in between 1970 and early 1990’s at several locations at NAS Whidbey Island.

Contract Number:N4425517F4214
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:May 2018
07
Project Name:Modernize Pedestrian Crossing Signal
Description:

Work will include the installation of two new street lights at a crosswalk near Hangar 5 on Charles Porter Avenue.

Contract Number:N4425517F4232
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:May 2018
08
Project Name:Naval Station Everett Gun Range Maintenance
Description:

Clean and remove lead from the Caswell International Model LE7500 bullet trap.

Contract Number:PO 2384
Owner/Agency:Skookum Contract Services, NAS Whidbey Island
Location:Naval Station Everett
Completion Date:February 2018
09
Project Name:Security Upgrades, B993
Description:

Provide and install a security system for Bldg 993, Naval Hospital Oak Harbor on main entry doors and hallway 600C vestibule (by the quarterdeck) and to the Special Delivery Unit (SDU) hallway 500D vestibule.

Contract Number:N4425517F4266
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:December 2017
10
Project Name:Re-Skin Fitness Dome
Description:

Provide all the material, labor, equipment and supervision necessary to replace vinyl fabric and related components on building R-112, the MWR Fitness Dome.

Contract Number:N4425517F4249
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2018
11
Project Name:LAN AC Upgrades at FDA Bothell
Description:

Upgrade the air condition (AC) in LAN/IT data rooms internal areas as well meet Fire Code and other building codes.

Contract Number:GS-10-P-16-LT-D-7001/GS-P-10-17-LT-0004
Owner/Agency:General Services Administration
Location:Bothell, WA
Completion Date:December 2017
12
Project Name:Perimeter Security Fence Repair
Description:

Clear and grub vegetation, demolish and remove all ground structure of current existing security fence line, design and install new security fencing to enclose property.

Contract Number:N44255-16-D-8015-0009
Owner/Agency:NAVFAC NW, PWD Everett
Location:NOSC Portland
Completion Date:November 2017
13
Project Name:Repair Sewer at Beech Lane and B2735
Description:

Repair and replace a sewer line located near Beech Lane to Manhole 30-05 in Crescent Harbor Housing. Project also includes the reroute of the sewer lateral at Building 2735.

Contract Number:N4425517F4043
Owner/Agency:NAVFAC NW, PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:November 2017
14
Project Name:Naval Station Everett Pier Work
Description:

Pier B and South Wharf – HDPE Floats and debris boom repairs and modifications.  Provide coordination, design and construction services necessary to add various floating structures to portions of Pier Bravo (3 locations) and At either end of the existing debris boom. This project also makes repairs to the existing HDPE debris boom and steel pile structure in the vicinity of the South Wharf.

Contract Number:N44255-16-D-8015-0003
Owner/Agency:NAVFAV Northwest PWD Everett
Location:Naval Station Everett, WA
Completion Date:October 2017
15
Project Name:City of Langley Camano Avenue Intersection Improvements
Description:

Sidewalk demolition and preparation on Camano Avenue in Langley, WA.

Contract Number:0517077
Owner/Agency:Lakeside Industries / Island County Public Works
Location:Langley, WA
Completion Date:October 2017
16
Project Name:Install Egress Sidewalks at Bldg 1980
Description:

Install egress sidewalks at the playground gates at building 1980 on Naval Station Everett.

Contract Number:N44255-16-D-8015-0005
Owner/Agency:NAVFAC NW, PWD Everett
Location:Naval Station Everett, WA
Completion Date:August 2017
17
Project Name:Fire and Safety Repairs, B992
Description:

Repair Fire and Safety Issues, B992, Seaplane Base Fuel Pier. Modify the pier deck, fire curtains and firefighting access ports to meet Fire Code Requirements; Revise fuel piping configuration; eliminate unused valves and fittings; Provide new valve and flange connection; Provide a new davit assembly; Upgrade stripper system piping; Increase spill containment; Remove spill recovery tank and piping; Extend boarding brow to eliminate fall hazard.

Contract Number:N44255-16-C-0002
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:August 2017
18
Project Name:Potable Water Fluoride Dosing System
Description:

Replace the sodium fluoride injection system with a new fluorosilicic acid system for the potable water distribution system employees at Naval Air Station Whidbey Island.

Contract Number:N44255-16-D-0003-0005
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:August 2017
19
Project Name:Star Store
Description:

Provide construction services for the remodel of existing grocery store and restaurant.

Owner/Agency:Three Oh Seven, LLC
Location:Langley, WA
Completion Date:August 2017
20
Project Name:Ebey’s Landing NHR Storm Water Collection and Reuse
Description:

A storm water collection system at Farm 1 that includes storm drain, catch basins, pump tank, duplex pumps and control panel, overflow swale, discharge of storm water to an existing lagoon, a lagoon spillway, associated electrical connections, and pressure testing of the existing 6” PVC pipe to the south lagoon for leakage

Contract Number:P17PS00331
Owner/Agency:National Park Service
Location:Ebey's Landing NHR - Coupeville, WA
Completion Date:June 2017
21
Project Name:Install MP5000 Barrier – Jim Creek
Description:

Complete installation of the barrier system along main road of Jim Creek Naval Radio Station next to Building 05 at the Main Gate.

Contract Number:N44255-16-D-8015-0004
Owner/Agency:NAVFAC NW PWD Everett
Location:Jim Creek, WA
Completion Date:June 2017
22
Project Name:Entry Control Point Project
Description:

An Entry Control Facility provides installation security and monitors traffic entering the installation. This project will improve gate security at all active entry control points.

 

Contract Number:N44255-16-D-0003-0002
Owner/Agency:NVFAC NW PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2017
23
Project Name:Potable Water Meter Pit Improvements
Description:

Provide the required infrastructure to monitor the potable water flow to Navy Housing.  Design/Build.

 

Contract Number:N44255-16-D-0003-0004
Owner/Agency:NAVFAC NW PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2017
24
Project Name:Potable Water System Vault ‘A’ Replacement
Description:

Construct a new vault near the existing vault.

Contract Number:N44255-16-C-0006
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:February 2017
25
Project Name:Construct Shelter Between Bldg 2701 & 381
Description:

Construct  a shelter for active duty military personnel’s use out of the weather.

Contract Number:N44255-16-D-0003-0003
Owner/Agency:NAVFAC PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:April 2017
26
Project Name:Remove Trees and Repair Sidewalk
Description:

Remove trees with lifting roots that have caused damage to the sidewalks outside of Building B382. Repair damaged sidewalk.

Contract Number:N44255-16-R-0003-0001
Owner/Agency:NAVFAC NW PWD Whidbey island
Location:NAS Whidbey Island
Completion Date:April 2017
27
Project Name:Sea-Tac Shuttle Parking Lot
Description:

Construct 15,000SF gravel parking area: topography elevation and drainage; brush and debris removal from grading limits; pre-leveling; install catch basin and ductile iron pipe; regrade swale; concrete and crushed rock work.

Contract Number:WSS2017SPL
Owner/Agency:Feet Wet Partners LLC
Location:Oak Harbor, WA
Completion Date:March 2017
28
Project Name:Coupeville School District Water Service
Description:

Water line installation for the Coupeville School District on Terry Road.

Contract Number:CSD2017WLI
Owner/Agency:Coupeville School District
Location:Coupeville, WA
Completion Date:March 2017
29
Project Name:Repair/Refurbish Small Arms Training Complex
Description:

Decontaminate and remove rock from the down range areas of the pistol range and regrade the ground between the 25 yard target line and the foot of the backstop. Upgrade the pistol range. Replace damaged structural members at rifle range. Replace the Building 2580 septic system

Contract Number:N44255-16-C-0010
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:February 2017
30
Project Name:Replacement of Mellus Caretaker Cabin
Description:

Replace the existing Mellus Caretaker Cabin with two new Park Model pre-manufactured cabin units. Utilities design: water, sanitary, sewer, storm drainage and telecommunications.

Contract Number:F15PC00203
Owner/Agency:Fish & Wildlife Service
Location:Dungeness Nat'l Wildlife Refuge
Completion Date:January 2017
31
Project Name:Replace Runway Distance Markers
Description:

NAS Whidbey Island – Provide 26 LED L-858B Runway Distance Markers to replace the existing RDMs; 26 L867 power bases; 26 isolation step down transformers; power, counterpoise, grounding and bonding for each RDM, and provide all work, terminations and connections for complete, useable systems.

Contract Number:N44255-16-C-0005
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:December 2016
32
Project Name:Supply Potable Water to S. Wharf Trailers
Description:

Connection to water meter, backflow preventer installation, water service line installation, and connection to head trailers to the South Wharf Trailers located at Naval Station Everett.

Contract Number:N44255-16-D-8015-0002
Owner/Agency:NAVFAC NW PWD Everett
Location:South Wharf Naval Station Everett
Completion Date:December 2016
33
Project Name:ABA Sidewalk Parking
Description:

Provide sidewalk to the West and North of the ABA building. Install new gate for sidewalk access in the existing fence line. Provide and install ABA accessible door.

Contract Number:N44255-16-D-8015-0001
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Support Complex, Smokey Point, WA
Completion Date:November 2016
34
Project Name:FDA Tenant Improvement/Laboratory Follow on Projects
Description:

Laboratory improvement tasks located at the FDA Reginal Laboratory: Automatic Door Opening Mechanisms and Controls (multiple doors); Industrial Garbage Disposals and all required plumbing and electrical; Four (4) Foot Controls for laboratory sinks (water delivery system) and all required plumbing.

Contract Number:GS-10-P-16-LT-D-7001
Owner/Agency:GSA
Location:Bothell, WA
Completion Date:September 2016
35
Project Name:Repair ADRF Pavement and Repair Refueler Access Drive
Description:

Repair ADRF Pavement and to repair the Refueler Access Drive at NASWI.

Contract Number:N44255-14-D-8000-0024
Owner/Agency:NAVFAC NW PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2016
36
Project Name:Olympic View Elementary
Description:

Paving and Drainage Construction at Olympic View Elementary

Contract Number:OHSD02
Owner/Agency:Oak Harbor School District
Location:Oak Harbor, WA
Completion Date:September 2016
37
Project Name:Broad View Elementary
Description:

Broad View Elementary Paving and Drainage Project for Oak Harbor School District.

Contract Number:OHSD03
Owner/Agency:Oak Harbor School District
Location:Oak Harbor, WA
Completion Date:September 2016
38
Project Name:Clover Valley Elementary School
Description:

Door Replacements.

Contract Number:CSDR01
Owner/Agency:Oak Harbor School District
Location:Oak Harbor, WA
Completion Date:September 2016
39
Project Name:Construct Group Camp, San Juan Island NHP (SAJH)
Description:

Construction of a new educational camp site. Work includes site clearing and grubbing, selective trimming, grading, compaction, septic system, electrical service, building concrete pad construction and finishing, and other related work necessary to complete the work as designed.

Contract Number:P15PC00307
Owner/Agency:National Park Service Pacific West Region
Location:Friday Harbor, WA
Completion Date:August 2016
40
Project Name:Coupeville High School Track and Field Areas Improvement
Description:

Beynon Subcontract – Provided construction services for a new sports running track as well as improve the field areas for Coupeville High School.  Services provided: excavation, paving, construction of drainage strips

Contract Number:1605.055.01-1335
Owner/Agency:Beynon Sports Surfaces, Inc.
Location:Coupeville, WA
Completion Date:August 2016
41
Project Name:Oregon National Guard Base Running Track
Description:

Install new pavement in multiple locations.

Contract Number:W912JV-15-C-0008
Owner/Agency:Oregon National Guard
Location:Portland, Oregon
Completion Date:July 2016
42
Project Name:ATG Everett Renovation & Tenant Modifications
Description:

Provide coordination, design and construction services necessary to modify building 2200 to accommodate tenant occupancy increase and space revision requirements.

Contract Number:N44255-15-C-7015
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:June 2016
43
Project Name:Bldg #382 Fire Suppression
Description:

Provide all materials, labor, and equipment to design and install three Deep Fat Fryer Fire Suppression Systems in Building #382.

Contract Number:N44255-14-D-8000-0029
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2016
44
Project Name:Wolf Creek Bldg #369
Description:

Remove out of date storage shelves, mezzanine, epoxy coat floor and provide a secure enclosure for the uniform storage area. Valdez Construction is the Subcontractor. Wolf Creek Federal Services, Inc/NSBOSC is the Prime Contractor.

Contract Number:NS-23328
Owner/Agency:Wolf Creek Federal Services
Location:NAS Whidbey Island
Completion Date:June 2016
45
Project Name:Replace Flooring B2679 Child Development Center (CDC)
Description:

Provide all materials, labor, equipment, and supervision necessary to remove all existing flooring and base and install new flooring and base in all rooms Building 2679 Child Development Center.

Contract Number:N44255-14-D-8000-0015
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2016
46
Project Name:Repair Eye Wash and Shower, B992
Description:

Repair and replace eye wash features at B992. Design mounting pad,  to secure new enclosure that meets all requirements ensure compliances.

Contract Number:N44255-14-D-8000-0023
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2016
47
Project Name:Refresh Spaces Bldgs. 2681 and 2892
Description:

Standardize exterior and interior appearances to reduce maintenance costs and turn-around time for change of tenants for Bldg #2681 and #2892.

Contract Number:N44255-14-D-8000-0027
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2016
48
Project Name:Replace Air Compressor & Tank Bldg 2595
Description:

Repair by replacement of existing failing air compressor and tank with a new energy efficient air compressor and tank.

Contract Number:N44255-13-P-5028
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:May 2016
49
Project Name:Renovate Office Spaces at Bldg. 108
Description:

Renovate Office Spaces at Bldg. 108, NAS Whidbey Island, WA. Replacing carpeting, removing murals, re-painting walls and refinishing doors, replacing ceiling tiles on the second floor of Bldg. 108 similar to match the appearance of the first floor.

Contract Number:N44255-14-D-8000-0028
Owner/Agency:NAVFAC NW NAS Whidbey Island
Location:NAS Whidbey Island
Completion Date:April 2016
50
Project Name:Secure Traffic Entry Warehouse #B369
Description:

Removal of existing rollup doors and installation of new power rollup door and manual coiling grille.

Contract Number:N44255-14-D-8000-0025
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2016
51
Project Name:Cornet Bay Fire Station
Description:

Demolition of existing fire station and construction of new Cornet Bay Station 21

Contract Number:CBFS-21
Owner/Agency:North Whidbey Fire and Rescue
Location:Oak Harbor, WA
Completion Date:March 2016
52
Project Name:Remove Steam Piping
Description:

Provide all materials, labor, and equipment to remove the specified above grade steam line. Provide all transportation and processing to properly dispose of these materials in a lawful and environmentally correct manner. Demolish specified abandoned Steam pits.

Contract Number:N44255-14-D-8000-0009
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2016
53
Project Name:Oregon National Guard Misc. Repairs
Description:

Miscellaneous repairs for Oregon National Guard in Portland Oregon. Buildings 135, 170, 310, 275, 491

Contract Number:W912JV-15-C-0011
Owner/Agency:Oregon National Guard
Location:Portland, Oregon
Completion Date:February 2016
54
Project Name:Pump Station 198 Repairs
Description:

Remove utility infrastructure and controls that are structurally degraded, inoperable, and unwarranted,  install new pump seals on three of the four existing pumps,  paint the interior and exterior walls, ceilings, railings, supports, piping, conduits, fittings, and valves, and install polyaspartic flooring in each room of the building,  replace approximately 75 linear feet of 10 inch water mains and valves, and reconfigure  plumbing to eliminate cross connection(s) between storm water and grey water and design and install a new drain field for the building.

Contract Number:N44255-14-D-8000-0013
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:February 2016
55
Project Name:Building 382 Nimitz Galley Flooring
Description:

Replace worn out and damaged flooring in Building 382 Nimitz Galley.

Contract Number:N44255-15-R-9006
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2016
56
Project Name:RSL Relocation & Pad Construction
Description:

Install new 17’x 17’ x 6″ slab on top of an existing slab.

Contract Number:N44255-14-D-8000-0026
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2016
57
Project Name:Airfield Concrete Repairs
Description:

Repaired by replacing Airfield Pavement slabs associated with multiple locations.

Contract Number:N44255-14-C-8013
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:October 2015
58
Project Name:All American Grill
Description:

VALDEZ WA PATRIOT JOINT VENTURE: This is a design-build project. Kitchen Design, Electrical Design, General Conditions, Demolition, Framing, Drywall, Paint, Flooring, Carpentry, Blinds, Kitchen Hood, Plumbing, Electrical Power and Data.

Contract Number:N44255-15-R-3000
Owner/Agency:NAVFAC NW Public Works
Location:Naval Base Kitsap, Bremerton
Completion Date:December 2015
59
Project Name:LPO NWR Construct McDowell Flow Control Structure & Appurtenances
Description:

Re-configured existing topography as necessary to construct the McDowell Lake Flow Control Structure and Appurtenances.

Contract Number:F1PX00335
Owner/Agency:US Fish and Wildlife Service
Location:Coleville, WA
Completion Date:October 2015
60
Project Name:Building #01 Roof Coating Application
Description:

Designed and provided for approval a specific polyurea based roof coating system specification tailored to the specific climate for the roof system being coated.

Contract Number:N44255-14-C-6024
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:October 2015
61
Project Name:Design and Build Comfort Station at Turnbull National Wildlife Refuge
Description:

Installed a new precast flush concrete double restroom building. The new restroom building is approximately 23 feet wide and 26 feet in length.

Contract Number:F14PC00220
Owner/Agency:US Fish and Wildlife Service
Location:Colville, WA
Completion Date:August 2015
62
Project Name:Hangar 7 Refurbish
Description:

Cleaned, repaired and refurbished floor, wall and ceiling finishes on the first and second floors of Hangar 7.  Installed one new Secret Internet Protocol Router Network (SIPRNet) connection point in Room 232. Added acoustic absorbing material to walls and ceiling of Room 201.

Contract Number:N44255-14-D-8000-0002
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:July 2015
63
Project Name:Painting Interior of Building #2679 – Child Development Center
Description:

Provided all materials, labor, equipment, and supervision necessary to paint all existing rooms in Building 2679 – Child Development Center.

Contract Number:N44255-14-D-8000-0014
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:July 2015
64
Project Name:Building #B2758: Restore Building Systems Aviation Survival Training Facilities
Description:

Prime Contractor: Global Engineering & Construction, LLC. Subcontractor: Valdez Construction. Restore Building Systems Aviation Survival Training Facilities/ASTC Whidbey Island.  All Civil, Structural and General Contracting – Not including HVAC & Plumbing or Electrical & Electronic Systems, or Fire Sprinkler Systems, nor Roofing Replacement

Contract Number: SC-0013-MAS-MC24
Owner/Agency:Prime Contractor: Global Engineering & Construction, LLC
Location:Whidbey Island
Completion Date:June 2015
65
Project Name:Meteorological Tower Site Clearing and Site Prep
Description:

Cleared and disposed of debris an approximately 7.75 acre forested site on Wheeler Mountain, on Naval Radio Station Jim Creek.

Contract Number:N44255-15-P-7001
Owner/Agency:NA VFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2015
66
Project Name:Nortz Trail Road Jogging Improvements
Description:

Nortz Trail Road jogging improvements NAS Whidbey Island. Stake center line w/ 8ft off sets (water side) every 100ft with pink ribbon; Stake mowing limit of other side with white ribbon – 16ft from center line off set. These stakes will be moved in to show trail edge after mowing; Stake silt fence with blue ribbon; Stake pipes/culverts to be replaced with blue and white; Stake and or paint all obstructions, e.g., iron valve covers, stand pipes, culverts that stay in place

Contract Number:N44255-14-D-8000-0011
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2015
67
Project Name:Installation of New Back Flow Assembly
Description:

After investigation, the internal plumbing at the Hospital, building 993 needed installation of a new reduced pressure back-flow assembly.

Contract Number:N44255-15-D-8000-0006
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:February 2015
68
Project Name:Construct Interceptor Trench/Drain
Description:

Installed 700 lineal feet of drain lines, including catch basins and outfall.

Contract Number:N44255-15-D-8000-0012
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2015
69
Project Name:Underground Storage Tank (UST) Removal
Description:

Conducted closure, removal and site assessment of three (3), underground storage tanks (UST).  Two (2), located at NAS Whidbey Island Flying Club and one (1), at Bremerton National Airport.

Contract Number:N44255-15-D-8000-0008
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2015
70
Project Name:Saratoga Gate – Fiber Optic Installation
Description:

Provided and installed approximately 4200 feet of 12 strand underground/overhead rated Corning fiber optic cable.

Contract Number:N44255-15-D-8000-10
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:December 2014
71
Project Name:Water Heater Replacement Building 1950
Description:

Removed and properly disposed of existing hot water heater.  Replaced with condensing type water heater.

Contract Number:N44255-14-P-6032
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:December 2014
72
Project Name:Concrete Foundation Pads
Description:

Provided and constructed all the material, labor, and equipment necessary to construct two 10’ x 10’ concrete foundation pads.

Contract Number:N44255-15-D-8000-0007
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:November 2014
73
Project Name:Area 6 Debris Removal
Description:

Removed and properly dispose of approximately 53 metal clad flotation sections of pier, wooden sections of pier, miscellaneous objects, foreign debris and trash located within 60 feet of pier.  Restored area landscaping to a uniform condition.

Contract Number:N44255-15-D-8000-0005
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:October 2014
74
Project Name:MTOC Storage Building
Description:

Constructed a secure electronics storage area under the mezzanine near the SW corner of the building. Removed the single story offices and reconfigure approximately half of the first floor to accommodate palletized equipment on industrial storage racks. Modified relocated or removed electrical, mechanical, compressed air, water, and fire alarm devicesas necessary.  Installed marking and signage to clearly identify vehicle lanes, electrical panel clear zones, hazardous areas and obstructions. Provided bollards with safety yellow and reflective coatings to protect electrical equipment, partitions and gates from forklift impact.

Contract Number:N44255-14-D-8000-0003
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2014
75
Project Name:Dworshak Quarters Sprinkler System
Description:

Installation of control valves, low voltage wiring, and a new timer into the existing sprinkler system at the Dworshak Fish Hatchery.

Contract Number:F14PX00213
Owner/Agency:U.S. Fish and Wildlife Service, Pacific Region
Location:Ahsahka, ID
Completion Date:September 2014
76
Project Name:Repair and Stabilize Crescent Harbor Marsh Berm
Description:

Hauled and placed of approximately 1,100 cubic yards of rock, sand and topsoil in order to reinforce an existing berm which supported a sewer transport line.  Final restoration included installation of native plants and hydro-seeding.

Contract Number:N44255-14-D-8000-0001
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2014
77
Project Name:Fiber Cable Installation
Description:

Installed fiber optic cable at multiple locations.

Contract Number:N44255-14-P-6022
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:September 2014
78
Project Name:Replacement of FLOLS Control Cables
Description:

Replaced four complete FLOLS communications cables, four complete FLOLS wire trailer pad power services, and four complete LSO shack power services on NAS Whidbey.

Contract Number:N44255-11-D-5003-0025
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2014
79
Project Name:NCTAMS Trench Repair
Description:

Covered exposed soils from an improperly placed communication line with a berm of clean soils and hydro-seed.

Contract Number:N44255-14-D-8000-0004
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2014
80
Project Name:Repair Fire Suppression System
Description:

Corrected deficiencies to the fire suppression system at Building 975, NAS Whidbey Island. Work included installation of smoke detectors, automatic door closers, labeling wires and buttons, and other miscellaneous fire protection requirements.

Contract Number:N44255-11-D-5003-0026
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:September 2014
81
Project Name:Install Irrigation System – Dworshak Fish Hatchery
Description:

Installed new lawn irrigation systems at 4 living quarters at Dworshak Fish Hatchery.

Contract Number:F14PX00213
Owner/Agency:US Fish & Wildlife
Location:Orofino, ID
Completion Date:August 2014
82
Project Name:Charles Porter Paving Repairs
Description:

Installation of sidewalks, asphalt grinding, 30,000 square yards of 2″ asphalt overlay including striping for Charles Porter Avenue.

Contract Number:N44255-11-D-5003-0022
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:July 2014
83
Project Name:Replace Heat Recovery Chiller, B-2700
Description:

Demolished and proper disposal of existing chiller, draining the process water, recovering the refrigerant, disconnecting the electrical and piping. Installed new chiller, refrigerant, electrical and piping.

Contract Number:N44255-11-D-5003-0014
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:July 2014
84
Project Name:Runway/Airfield Repairs
Description:

Resurfaced taxi way Juliet at NAS Whidbey for parking aircraft.  This consisted of installing 114 air craft tie downs, 2300 SY of asphalt grinding, 9555 SY of 3″ asphalt overlay and striping.

Contract Number:N44255-11-D-5003-0018
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:June 2014
85
Project Name:Energy Conservation Project #5032
Description:

Energy upgrade project which included over 500 lighting fixtures and 3 heat pump replacements at multiple locations.

Contract Number:N44255-13-C-5032
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:June 2014
86
Project Name:Install Operating Room Scrub Sinks
Description:

Removed Operating Room Scrub Sinks, installed new sinks with infrared modules, repaired drywall, installed new piping and valves, connected to existing drains, patched and paint.

Contract Number:N44255-11-D-5003-0019
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:May 2014
87
Project Name:Install Land Based MOVLAS Capability
Description:

Installation of a 240 volt electrical service for the Manually Operated Visual Landing Aid System, (MOVLAS) to fully establish the capability to runway sites 14 to 25 at NASWI Ault Field.

Contract Number:N44255-11-D-5003-0024
Owner/Agency:NAVFAC Northwest, PWD Whidbey Island
Location:NASWI, WA
Completion Date:April 2014
88
Project Name:CDC Fire Alarm
Description:

Removed the existing and out dated fire alarm and notification system.  Installed Government furnished Monaco fire alarm and mass notification equipment.

Contract Number:N44255-11-D-5003-0009
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:April 2014
89
Project Name:Roll Up Doors, B369
Description:

Removed and replaced four (4), existing roll up doors with a new rolling door, rolling grille door, and high speed rolling fabric door combinations. Constructed a new concrete forklift ramp.

Contract Number:N44255-11-D-5003-0023
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:April 2014
90
Project Name:Replace IFLOLS Pads
Description:

Demolished existing concrete pads, located new IFLOLS pads, installed new concrete pads and performed survey of finished IFLOLS pads.

Contract Number:N44255-11-D-5003-0013
Owner/Agency:NAVFAC Northwest, PWD Whidbey Island
Location:NASWI, WA
Completion Date:February 2014
91
Project Name:Repair Medical Gas System
Description:

Corrected NFPA 99 deficiencies in the nitrous oxide manifold, the medical vacuum lines and ventilation of room 371 at NHOH Bldg 993.

Contract Number:N44255-11-D-5003-0017
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:February 2014
92
Project Name:Replace Compressor on AC
Description:

Replaced failed compressor in York Air Cooled Chiller Unit.

Contract Number:N44255-13-P-5028
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:March 2014
93
Project Name:Outfall A Storm Drain Repair
Description:

Insertion of a 100 ft.. of new 32” HDPE pipe the entire length of pipe, from outfall to oil-water separator.

Contract Number:N44255-13-P-5026
Owner/Agency:NAVFAC Northwest PWD Everett
Location:Naval Station Everett
Completion Date:March 2014
94
Project Name:ACM Windows
Description:

Encapsulation of all interior Asbestos Containing Material (ACM) glazing compound/putty with an asbestos encapsulating coating to all windows in building 371.

Contract Number:N44255-11-D-5003-0012
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2014
95
Project Name:OLF Fencing
Description:

Installed street lights and chain link fencing with automated gate and keypad at OLF Coupeville, WA.

Contract Number:N44255-11-D-5003-0021
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2014
96
Project Name:Correct Electrical Installation
Description:

Provided new equipotential ground plane system, replaced underground cable and performed a 30-day load study on electrical system.

Contract Number:N44255-11-D-5003-0010
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:March 2014
97
Project Name:Install Security Cable at OLF
Description:

Installed 1022 concrete blocks with 10,600 ft. of wire for an ATFP barrier around the OLF airfield.

Contract Amount:
Contract Number:N44255-11-D-5003-0015
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2014
98
Project Name:Airfield Holding Position Signs
Description:

Installed 32 ‘Holding Position’ signs at various locations at NAW Whidbey’s air field.

Contract Amount:
Contract Number:N44255-11-D-5003-0016
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2014
99
Project Name:Replace Emergency Generator, B385
Description:

Removed and replaced existing 500KW generator with a Tier 3 EPA compliant 230KW standby rated generator at Building 385, NASWI.

Contract Amount:
Contract Number:N44255-11-D-5003-0020
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:January 2014
100
Project Name:Little Pend Oreille National Wildlife Refuge
Description:

Constructed visitor site features, including a boardwalk, stone structures, asphalt and concrete parking areas.

Contract Amount:
Contract Number:F13PC00180
Owner/Agency:US Fish and Wildlife Service
Location:Colville, WA
Completion Date:November 2013
101
Project Name:Install Electric Power at Maui & Torpedo Gates
Description:

Electrical service installation of MP-5000s located at Maui Gate and Torpedo Gate, push button station, stop/go signal light and solar power charger.

Contract Number:N44255-11-D-5003-0011
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:November 2013
102
Project Name:Construct Material Storage Bins
Description:

Design and build a three (3)  bay material storage bin unit, 48ft. long x 16ft. wide including structural concrete slab, 6-foot tall CMU block masonry walls, 8 steel bollards and asphalt patching.

Contract Amount:
Contract Number:N44255-13-P-5022
Owner/Agency:NAVFAC Northwest PWD Everett
Location:NS Everett, WA
Completion Date:October 2013
103
Project Name:Intake Sediment Removal
Description:

Removed river sediment at pump house to facilitate efficient pumping of fish production water.

Contract Amount:
Contract Number:F13PC00149
Owner/Agency:US Fish and Wildlife Service
Location:Neah Bay, WA
Completion Date:September 2013
104
Project Name:Lynden Border Crossing Septic Tank Replacement
Description:

Designed and installed a low maintenance and effective septic system that included two (2) 1,500 gallon septic tanks and one (1) 1,750 pump tank to provide for 30 years of service.  All while minimizing disruption to the tenant regarding potable water and sewer system downtime.  Fully restored work site to pre-project conditions.  Verified proper function of the drainfield and any steps recommended for recovery if necessary.

 

Contract Number:GS-10P-13-XB-P-0009
Owner/Agency:GSA
Location:Lynden, WA
Completion Date:April 2013
105
Project Name:De-icer Tank
Description:

Designed and constructed a 9,000-gallon above ground fiberglass storage tank for Cryotech E36 airfield pavement de-icer.

Contract Amount:
Contract Number:N44255-11-D-5003-0008
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:January 2013
106
Project Name:Replace Outfall Pipe
Description:

Replaced 18 inch storm drain out fall including, adding 8 foot to existing pipe.  Added 250 yards of rip-rap rock for slope stabilization and water defusing.

Contract Amount:
Contract Number:N44255-11-D-5003-0007
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:December 2012
107
Project Name:Maylor Point Beach Restoration
Description:

Beach restoration, including adding 12,000 yards of sand habitat mix along 2,300 ft. of shoreline.

Contract Amount:
Contract Number:N44255-11-D-5003-0005
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:December 2012
108
Project Name:Ault Field Traffic/Pedestrian Improvements
Description:

Installed overhead lights, completed sidewalk upgrades, revised crosswalks, added, relocated traffic signs and added 22 thermoplastic crosswalk markings.

Contract Amount:
Contract Number:N44255-11-D-5003-0006
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:December 2012
109
Project Name:Shoreline Monitoring System
Description:

Completed Shoreline Monitoring System (SLIMS) sensor network array infrastructure including, concrete pole bases, trenching, electrical wiring, fiber optic cabling, DVR, monitors, cameras and associated hardware.

Contract Amount:
Contract Number:N44255-11-D-5003-0004
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:October 2012
110
Project Name:Resurface Tennis Courts
Description:

Resurfaced tennis courts with modular surfacing including new fencing, backboards, benches, sidewalk and tennis nets.

Contract Amount:
Contract Number:N 44255-11-D-5003-0002
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:June 2012
111
Project Name:Repave Marblemount Ranger Station
Description:

Demolished and removed existing pavement, including installation of catch basins and oil water separator.  Managed installation of HMA and vegetated swales and overflows.

Contract Amount:
Contract Number:P11PC00257
Owner/Agency:National Park Service
Location:Marblemount, WA
Completion Date:June 2012
112
Project Name:Above Ground Fuel Tank
Description:

Design/Build – Decommission and dispose of two 500-gallon USTs. Installed a new AST, AST foundation slab, new fuel pumps and all associated appurtenances.

Contract Amount:
Contract Number:P11PC80258
Owner/Agency:National Park Service
Location:Marblemount, WA
Completion Date:March 2012
113
Project Name:Renovate Office Building #2789
Description:

Renovated office building, including demolition and rough framing of walls.  Removed and relocated light switches, receptacles and communication receptacles.

Contract Amount:
Contract Number:N44255-11-D-5003-0003
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NASWI, WA
Completion Date:March 2012
114
Project Name:Regrade Asphalt Building #2704
Description:

Demolition, excavation, installation of Type I catch basin, placement of crushed rock base and top courses, asphalt and topsoil.

Contract Number:N44255-11-D-5003-0001
Owner/Agency:NAVFAC Northwest PWD Whidbey Island
Location:NAS Whidbey Island
Completion Date:December 2011
115
Project Name:Replace Storage Building, San Juan NHP
Description:

Construction of a maintenance storage building,  waste/recycling enclosures and associated site work; demolition of an existing storage shed.

Contract Amount:
Contract Number:N9530100004
Owner/Agency:National Park Service
Location:San Juan Island National Historic Park, WA
Completion Date:April 2011