Archives

Prevent Water Infiltration South Wall, B1002, Puget Sound Shipyard

VALDEZ- WA PATRIOT JOINT VENTURE

This is a Design-Build project to mitigate leakage in building 1002. Currently, there is regular water leakage at the south exterior wall and appears to occur after heavy rainstorms or prolonged periods of rain.

Read More

Precision Approach Radar Site Preparation

VALDEZ-WA PATRIOT JOINT VENTURE

Site preparation of Runway 14-32 and 7-25 for the installation of a commercial off the shelf Precision Approach Radar system.

Read More

Inspect Industrial Storm Water System Ault Field

VALDEZ-WA PATRIOT JOINT VENTURE

Provide equipment, materials, and labor necessary to replace approx. 200 linear feet of existing storm drain pipe, repair airfield Portland cement concrete pavement, repair asphalt cement concrete, repair concrete curb, clean stormwater facilities, remove and collect sediments and debris, transport, decant, store, test and dispose of solid spoils; conduct CCTV inspections and verify the type, location, size, materials, condition...

Read More
Older Entries >