Skip to content
(360) 679-3000
  • Company
  • Services
  • Projects
    • Current Projects
    • Civil and Heavy Construction
    • Commercial/Multifamily
    • Design Build
    • Government
    • Industrial
    • Waterfront and Marine
  • Past Performances
    • Performance Reviews
  • Certifications
  • Contact

Correct Electrical Installation

Posted on July 29, 2014June 16, 2017 by admin

Provided new equipotential ground plane system, replaced underground cable and performed a 30-day load study on electrical system.

Bookmark the permalink.

Post navigation

← Intake Sediment Removal
Install Electric Power at Maui & Torpedo Gates →

Categories

  • News

Valdez Construction 499 NE Midway Blvd. Ste. 2.
Oak Harbor, WA 98277

(360) 679-3000
  • Bid Room
  • Privacy Policy
  • Employment
  • Blog
  • Valdez Login
© Copyright 2019 Valdez Construction. All rights reserved.