Skip to content
(360) 679-3000
  • Company
  • Services
  • Projects
    • Current Projects
    • Civil and Heavy Construction
    • Commercial/Multifamily
    • Design Build
    • Government
    • Industrial
    • Waterfront and Marine
  • Past Performances
    • Performance Reviews
  • Certifications
  • Contact

Outfall A Storm Drain Repair

Posted on July 29, 2014June 16, 2017 by admin

Insertion of a 100 ft.. of new 32” HDPE pipe the entire length of pipe, from outfall to oil-water separator.

Bookmark the permalink.

Post navigation

← Replace Compressor on AC
Repair Medical Gas System →

Categories

  • News

Valdez Construction 499 NE Midway Blvd. Ste. 2.
Oak Harbor, WA 98277

(360) 679-3000
  • Bid Room
  • Privacy Policy
  • Employment
  • Blog
  • Valdez Login
© Copyright 2019 Valdez Construction. All rights reserved.