Pump Station 198 Repairs

Remove utility infrastructure and controls that are structurally degraded, inoperable, and unwarranted,  install new pump seals on three of the four existing pumps,  paint the interior and exterior walls, ceilings, railings, supports, piping, conduits, fittings, and valves, and install polyaspartic flooring in each room of the building,  replace approximately 75 linear feet of 10 inch water mains and valves, and reconfigure  plumbing to eliminate cross connection(s) between storm water and grey water and design and install a new drain field for the building.