Skip to content
(360) 679-3000
  • Company
  • Services
  • Projects
    • Current Projects
    • Civil and Heavy Construction
    • Commercial/Multifamily
    • Design Build
    • Government
    • Industrial
    • Waterfront and Marine
  • Past Performances
    • Performance Reviews
  • Certifications
  • Contact

Replace Outfall Pipe

Posted on July 29, 2014May 19, 2016 by admin

Replaced 18 inch storm drain out fall including, adding 8 foot to existing pipe.  Added 250 yards of rip-rap rock for slope stabilization and water defusing.

Bookmark the permalink.

Post navigation

← De-icer Tank
Maylor Point Beach Restoration →

Categories

  • News

Valdez Construction 499 NE Midway Blvd. Ste. 2.
Oak Harbor, WA 98277

(360) 679-3000
  • Bid Room
  • Privacy Policy
  • Employment
  • Blog
  • Valdez Login
© Copyright 2019 Valdez Construction. All rights reserved.