Replace Sewage Drainfield at Heart o’ the Hills Campground

This project consists of the design and construction of modifications to an existing on-site sewage system for Heart O’ the Hills Campground. Modifications to the system include installation of a new pressure distribution drainfield within the footprint of the existing drainfield, and replacement of the existing pump control panel to switch from demand dosing to timed dosing. This project also includes potholing and other investigative techniques to locate the trajectory of the force main where it crosses Hurricane Ridge Road near the Entrance Station