Skip to content
(360) 679-3000
  • Company
  • Services
  • Projects
    • Current Projects
    • Civil and Heavy Construction
    • Commercial/Multifamily
    • Design Build
    • Government
    • Industrial
    • Waterfront and Marine
  • Past Performances
    • Performance Reviews
  • Certifications
  • Contact

Runway/Airfield Repairs

Posted on April 29, 2015June 16, 2017 by admin

Resurfaced taxi way Juliet at NAS Whidbey for parking aircraft.  This consisted of installing 114 air craft tie downs, 2300 SY of asphalt grinding, 9555 SY of 3″ asphalt overlay and striping.

Bookmark the permalink.

Post navigation

← Charles Porter Paving Repairs
Install Operating Room Scrub Sinks →

Categories

  • News

Valdez Construction 499 NE Midway Blvd. Ste. 2.
Oak Harbor, WA 98277

(360) 679-3000
  • Bid Room
  • Privacy Policy
  • Employment
  • Blog
  • Valdez Login
© Copyright 2019 Valdez Construction. All rights reserved.