Archives

Replace Lift Stations at Ohanapecosh Campground, Mount Rainier

Replace two wastewater lift stations in Loops A & F of Ohanapecosh Campground at Mount Rainier National Park.

Read More

Hoh Rain Forest

Modifications to the Hoh Rain Forest Wastewater Treatment and Disposal System to meet Washington State Department of Health large on-site sewage system permit requirements. The work includes removal of vegetation to expand the drain field footprint and excavation of the expanded drain field as needed to install new treatment-disposal system; construction of new sand-lined beds and installation of pressurized subsurface drip emitter...

Read More

Mellus Caretaker Cabin

Replace the existing Mellus Caretaker Cabin with two new Park Model pre-manufactured cabin units. Utilities design: water, sanitary, sewer, storm drainage and telecommunications.

Read More
Older Entries >