Archives

FDA Bothell Phase III Restroom and Lunchrooms Remodel

To repair and renovate aging lunch room and kitchenette facilities to create a positive work environment. This project will utilize a highly collaborative design build delivery. The main objectives are; improve energy and water efficiency, reduce spread of germs, meet ABA accessibility codes and improve the ability to operate and maintain the facilities.

Read More

ATG – Everett Renovation

Naval Station Everett Building 2200 – ATG Space Renovation and Tenant Modifications. Renovations include in multiple locations: Demolition; construction of new doors and frames; interior finishes – flooring, painting, painting of doors, signage, cabinets, wall hangings, penetrations; storage cage (Provide fabricated manufactured storage cage fencing, door, and lid; wall-to-wall shelving); mechanical -cooling, main air handler, controls and testing systems; electrical – power panel, power, chiller...

Read More

All American Grill – JV

Joint Venture Project – Design/Build Renovation of All American Grill located at the Naval Base Kitsap, in Bremerton, WA.

Read More
Older Entries >