HDPE Debris Deflector Repairs – NS Everett
Completed
Pier B and South Wharf – HDPE Floats and debris boom repairs and modifications. Provided coordination, design and construction services necessary to add various floating structures to portions of Pier Bravo (three locations) and at either end of the existing debris boom. This project also included making repairs to the existing HDPE debris boom and steel pile structure in the vicinity of the South Wharf.